Project 1 : Defining and Documenting a Project
Project 1 : Case Study of Building Services
This is a group project to perform a case study on building services systems (mechanical ventilation, air-conditioning, fire protection, mechanical transportation system) applied and installed in multi-storey buildings involving public use
Learning Objectives:
-
To introduce students to the basic principles, processes and equipments of various building services systems found in buildings.
-
To expose students to the integration of various building services systems in a building.
-
To allow students to demonstrate their understanding of building services systems and statutory requirements.
-
To develop students’ understanding and familiarization in applying the correct graphic communications according to the required standards.
Selected Building :
Menara OBYU, Damansara Perdana
Project 2 : Application of Building Services
![]() | ![]() | ![]() | ![]() |
---|---|---|---|
![]() | ![]() |
Students will demonstrate their understanding of building services by providing the most appropriate systems for the final design project in Design Studio IV, Community Swimming Centre, which include electrical supply system, cold water and hot water supply system, sewerage and sanitary system, and rainwater/ surface water drainage system.
Learning Objectives:
-
To develop the students’ understanding and knowledge of building services systems in design and construction.
-
To apply appropriate building services system and solution for a specific design.
-
To demonstrate a comprehensive understanding of applicability of specific building services systems in the design in response to practical considerations.
-
To develop students’ ability to resolve issues related to specific building services systems.